The Trans Mountain Pipeline Expansion (TMX) has been running “spectacularly well since startup” and plans are being considered to boost the pipeline’s capacity, Trans Mountain Chief Financial Officer Todd Stack said during a fireside chat Wednesday at RBN’s School of Energy Canada in Calgary.
As we noted in an Analyst Insight on Tuesday, waterborne crude exports from Western Canada were less than 100 Mb/d prior to TMX coming online in May 2024. Volumes shifted dramatically higher once TMX began service, as the expansion increased the system’s overall throughput capacity from 300 Mb/d to 890 Mb/d. Stack said the pipeline is running at about 88% capacity.