- Blog

Slow Train Coming – Victory of American Ingenuity Over Crude Pipeline Delays And Congestion

The story of crude-by-rail (CBR) in North America is that of a victory of good old U.S. ingenuity over the lack of pipeline capacity that stranded booming shale oil production in 2012. The lower cost to market of “on-ramp” rail terminals allowed surging crude production a route to (mainly) coastal refineries - igniting a building boom over 4 short years that has left 82 load terminals and 44 destination terminals operating today  - many of them now underutilized. Along the way monthly lease rates for rail tank cars that reached $2,750/month at the height of the boom are down to $325/month after the bust – with many lease holders paying daily rent to park their empty cars. Today we conclude our series reviewing the state of CBR today.

- Blog

Slow Train Coming – Massive Over Capacity at Gulf Coast Crude-By-Rail Terminals

Our analysis shows that about 1.7 MMb/d of crude-by-rail (CBR) unload capacity has been built out and is operating in the Gulf Coast region today. According to Energy Information Administration (EIA) data for January 2016 an average of only 142 Mb/d was shipped into the region by rail in January 2016 down from a peak of just under 450 Mb/d in 2013 and an average of 235 Mb/d in 2015. In other words, the current unload capacity represents a whopping 12 times January 2016 shipments – a massive overbuild that is continuing today as new terminals are still planned. Today we look at the fate of Gulf Coast CBR terminal unload capacity.