But I Would Pipe Five Hundred Miles - Evaluating Economics of a New Natural Gas Pipeline (Part 4)

Author Rick Smead

It’s no secret that a long list of pipeline projects have been proposed to help move natural gas out of the Northeast production areas. But if you were a Marcellus or Utica producer, how would you decide whether you were interested in new capacity that hadn’t been proposed or built yet? Of course, pipeline companies have armies of engineers, cost estimators, and market analysts to bring one of these monster projects to fruition. But for anyone else, particularly in the early stages, how do you even know it’s a reasonable idea? For anyone testing a concept, you need a way to ballpark some scenarios for a new pipe. We’ve been running a blog series on our RBN Pipeline Economics Estimation Model, a quick, rule-of-thumb “sanity test” for new capacity. Today, we wrap up our walk-through of the model, with a real-world example to gauge the accuracy of the model, and then with a discussion on how the model can be used to measure economies of scale in picking the minimum volume you probably need for a new pipeline.

- Blog

But I Would Pipe 500 Miles - Evaluating Economics of a New Gas Pipeline Part 3

Author Rick Smead

New and expansion natural gas pipeline projects have been part and parcel of the shale production boom in the U.S. Northeast. In fact, Northeast gas production could not have reached anywhere near its current level and become a major natural gas supplier to the U.S. without the substantial addition of takeaway capacity out of the Marcellus/Utica shale areas. At the same time, the competition among pipeline developers jockeying to be in the right place at the right time has been fierce. And now, low natural gas prices and uncertainty about future production growth have only increased the competition---not all projects will make it to in-service. The risks are higher for big pipeline projects, but so are the stakes. These days, the overall risk tolerance among shippers and investors is low, especially among producers. So if you’re a producer, how can you make sure you don’t end up on the wrong side of a transportation deal? In today’s blog, we continue our walk-through of the RBN Pipeline Economics Estimation Model.  We’ll follow up in a later installment with a real-world test and other ways to use the model.