Operator:Energy Transfer Commodity:NGLs Stage:Operational Project Type:New Build |
In Service Date:Q2/2016 Diameter:30 inches Length:533 miles Est Capital Cost:$ 1,800 Million |
Products:Y-grade Expansion Capacity:475 Mb/d Total Capacity:475 Mb/d |
Origin:Permian Basin, TX
United StatesPADD 3 Destination:Mont Belvieu, TX
United StatesPADD 3 |
The 24-inch portion of the pipeline transports 375,000 barrels per day from the Permian Basin to Bosque County, TX
The 30-inch pipeline transports 475,000 barrels per day from Bosque County, TX to Mont Belvieu, TX