Status
Commodity
NGLs
Operator
Energy Transfer
Stage
Operational
Products
Y-Grade
Project Type
New Build
In Service Date
Q2 2016
Metrics
Diameter
30 Inches
Expansion Capacity
475 Mb/d
Total Capacity
800 Mb/d
The 24-inch portion of the pipeline transports 375,000 barrels per day from the Permian Basin to Bosque County, TX
The 30-inch pipeline transports 475,000 barrels per day from Bosque County, TX to Mont Belvieu, TX