Status
Commodity
Crude Oil
Operator
Bridger Pipeline
Stage
Operational
In Service Date
Q2 2021
Metrics
Diameter
16 Inches
Total Capacity
150 Mb/d
Location
Origin
Johnson Corner, ND
United States
PADD 2
Destination
Baker, MT
United States
PADD 4
The South Bend Line was completed in Q1 2023